Construction Change Order v1.0.44
APK · 15.6 MB · version code 1000044 · Android 8.1+ · uploaded May 29, 2026
- Signature matches the Google Play version Details
Quick check before downloading
Answer this to unlock the download. It keeps automated downloaders away.
File information
- Version
- v1.0.44 (1000044)
- Uploaded
- May 29, 2026
- Size
- 15.6 MB
- Requires
- Android 8.1+ (API 27)
- CPU support
- Any (no native code)
- Graphics
- OpenGL ES 2.0+
- Screen
- Small screens and larger
- MD5
- aa15dac6670dcf1e5533292edf02862c
- Signing certificate (SHA-1)
- B4:67:DF:8B:22:64:A6:C0:0C:75:8E:BE:7D:A2:36:BA:0B:26:17:35
- Signed by
- CN=Maxim Barsuk
- File name
- com-snappii-corp-construction-change-order-1000044-74969422-aa15dac6670dcf1e5533292edf02862c.apk
- Package
- com.snappii_corp.construction_change_order
- Downloads (all versions)
- 1K+
- Age rating
- PEGI 3 · Everyone
What's new in v1.0.44
Minor bug fixes and stability improvements.
Permissions (23)
This version requests 23 permissions, 8 of them sensitive.
- Approximate location Sensitive android.permission.ACCESS_COARSE_LOCATION
- Camera Sensitive android.permission.CAMERA
- Modify shared storage Sensitive android.permission.WRITE_EXTERNAL_STORAGE
- Precise location Sensitive android.permission.ACCESS_FINE_LOCATION
- Read contacts Sensitive android.permission.READ_CONTACTS
- Read media audio Sensitive android.permission.READ_MEDIA_AUDIO
- Read shared storage Sensitive android.permission.READ_EXTERNAL_STORAGE
- Record audio (microphone) Sensitive android.permission.RECORD_AUDIO
- Advertising ID com.google.android.gms.permission.AD_ID
- Change wifi state android.permission.CHANGE_WIFI_STATE
- Control vibration android.permission.VIBRATE
- Flashlight android.permission.FLASHLIGHT
- Full network access android.permission.INTERNET
- Google Play install referrer com.google.android.finsky.permission.BIND_GET_INSTALL_REFERRER_SERVICE
- In-app purchases (Google Play Billing) com.android.vending.BILLING
- Prevent the device from sleeping android.permission.WAKE_LOCK
- Receive push notifications com.google.android.c2dm.permission.RECEIVE
- Run at startup android.permission.RECEIVE_BOOT_COMPLETED
- Run foreground services android.permission.FOREGROUND_SERVICE
- Schedule exact alarms android.permission.SCHEDULE_EXACT_ALARM
- Show notifications android.permission.POST_NOTIFICATIONS
- View Wi-Fi connections android.permission.ACCESS_WIFI_STATE
- View network connections android.permission.ACCESS_NETWORK_STATE
Security & authenticity
Security rating: Trusted
Signing certificate
- Signature matches the Google Play version Checked by the source store on May 29, 2026.
- Certificate issued to “Maxim Barsuk” This is the certificate of the Google Play version.
- Same certificate as the 4 other versions checked
Store checks
- Developer signature verified May 29, 2026
- Validated against Google Play May 29, 2026
- Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020
Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (4 other versions compared). AAPKs doesn't scan files itself.
How to install Construction Change Order on Android 8.1+
You'll need about 31.1 MB of free space.
- Download the APK — tap Download APK above (15.6 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
- Open the file — tap the download notification, or open Files › Downloads and tap com-snappii-corp-construction-change-order-1000044-74969422-aa15dac6670dcf1e5533292edf02862c.apk.
- Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
- Check the file (optional) — the MD5 of the downloaded file should be aa15dac6670dcf1e5533292edf02862c. If it differs, the file is damaged or was changed: delete it and download again.
- Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
- Open Construction Change Order — tap Open on the install screen, or find it in your app drawer.
Common install problems
- “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
- “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 8.1+). Download it again, or pick an older version.
- Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.