
At a glance
- Latest version
- v1.0.44 (1000044)
- Updated
- May 29, 2026 (4 months ago)
- APK size
- 15.6 MB
- Requires
- Android 8.1+ (API 27)
- CPU support
- Any (no native code)
- Graphics
- OpenGL ES 2.0+
- Category
- Business (app)
- Permissions
- 23 (8 sensitive)
- Website
- snappii.com
- Developer contact
- [email protected]
- Privacy
- Developer's privacy policy
About this APK
Construction Change Order is an app by Snappii in the Business category. It has no native code, so it runs on any Android processor.
Since version 1.0.37, the APK grew from 14.1 MB to 15.6 MB and the minimum Android version rose from 6.0 to 8.1. It asks for 23 permissions, 8 of them sensitive, including precise location, camera and record audio. Compared with version 1.0.43, it drops 2 permissions: “Read media images” and “Read media video”. The app offers in-app purchases through Google Play and can read the advertising ID that ad and analytics services use.
What's new in v1.0.44
Description
From the listing uploaded by “appupdater”.
Version history
5 versions are listed, going back to v1.0.37. Since v1.0.42 it requires Android 8.1+.
Security & authenticity
Signing certificate
- Signature matches the Google Play version Checked by the source store on May 29, 2026.
- Certificate issued to “Maxim Barsuk” This is the certificate of the Google Play version.
- Same certificate as the 2 other versions checked
Store checks and file details
- Developer signature verified May 29, 2026
- Validated against Google Play May 29, 2026
- Signed byCN=Maxim Barsuk
- Signing certificate (SHA-1)B4:67:DF:8B:22:64:A6:C0:0C:75:8E:BE:7D:A2:36:BA:0B:26:17:35
- File MD5aa15dac6670dcf1e5533292edf02862c
- Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020
Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (2 other versions compared). AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.
Permissions (23)
Construction Change Order requests 23 permissions, 8 of them sensitive.
- Approximate location Sensitive android.permission.ACCESS_COARSE_LOCATION
- Camera Sensitive android.permission.CAMERA
- Modify shared storage Sensitive android.permission.WRITE_EXTERNAL_STORAGE
- Precise location Sensitive android.permission.ACCESS_FINE_LOCATION
- Read contacts Sensitive android.permission.READ_CONTACTS
- Read media audio Sensitive android.permission.READ_MEDIA_AUDIO
- Read shared storage Sensitive android.permission.READ_EXTERNAL_STORAGE
- Record audio (microphone) Sensitive android.permission.RECORD_AUDIO
- Advertising ID com.google.android.gms.permission.AD_ID
- Change wifi state android.permission.CHANGE_WIFI_STATE
- Control vibration android.permission.VIBRATE
- Flashlight android.permission.FLASHLIGHT
- Full network access android.permission.INTERNET
- Google Play install referrer com.google.android.finsky.permission.BIND_GET_INSTALL_REFERRER_SERVICE
- In-app purchases (Google Play Billing) com.android.vending.BILLING
- Prevent the device from sleeping android.permission.WAKE_LOCK
- Receive push notifications com.google.android.c2dm.permission.RECEIVE
- Run at startup android.permission.RECEIVE_BOOT_COMPLETED
- Run foreground services android.permission.FOREGROUND_SERVICE
- Schedule exact alarms android.permission.SCHEDULE_EXACT_ALARM
- Show notifications android.permission.POST_NOTIFICATIONS
- View Wi-Fi connections android.permission.ACCESS_WIFI_STATE
- View network connections android.permission.ACCESS_NETWORK_STATE
Required hardware & features
- Location android.hardware.location
- Microphone android.hardware.microphone
- Landscape screen android.hardware.screen.landscape
- Portrait screen android.hardware.screen.portrait
- Touchscreen android.hardware.touchscreen
Construction Change Order APK: questions and answers
Is there a version of Construction Change Order for older Android phones?
The current version needs Android 8.1 or later. Version 1.0.39 is the newest listed build that installs on Android 7.1 and later. It is an old build: apps that rely on online services may no longer connect when they are this old. Get version 1.0.39 · All versions
Can I install this APK over the version I already have?
Yes, if your installed copy is older. It is signed like the Google Play version, so Android installs it as an update and keeps your data.
Is Construction Change Order free?
The APK is free to download, but the app offers in-app purchases through Google Play.
Is the Construction Change Order APK safe?
No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. Its signature matches the Google Play version. It is signed with the same certificate as the 2 other versions checked. After downloading, check that the file's MD5 is aa15dac6670dcf1e5533292edf02862c.