Construction Change Order v1.0.42

APK · 189.3 MB · version code 1000042 · Android 8.1+ · uploaded Aug 29, 2025

MD5 2105dd995ca8deb57b19cdee8a63633e TRUSTED

  • Signature matches the Google Play version Details

Quick check before downloading

Answer this to unlock the download. It keeps automated downloaders away.

Compared with the latest version

The latest version is v1.0.44, uploaded May 29, 2026 — about 9 months after this one.

  • Size: this file is 189.3 MB; the latest is 15.6 MB (173.7 MB smaller).
  • The latest version no longer asks for: Read media images, Read media video.

File information

Version
v1.0.42 (1000042)
Uploaded
Aug 29, 2025
Size
189.3 MB
Requires
Android 8.1+ (API 27)
CPU support
x86 32-bit, x86 64-bit, ARM (legacy), ARM 32-bit, ARM 64-bit, MIPS
Graphics
OpenGL ES 2.0+
Screen
Small screens and larger
MD5
2105dd995ca8deb57b19cdee8a63633e
Signing certificate (SHA-1)
B4:67:DF:8B:22:64:A6:C0:0C:75:8E:BE:7D:A2:36:BA:0B:26:17:35
Signed by
CN=Maxim Barsuk
File name
com-snappii-corp-construction-change-order-1000042-71545205-2105dd995ca8deb57b19cdee8a63633e.apk
Package
com.snappii_corp.construction_change_order
Downloads (all versions)
1K+
Age rating
PEGI 3 · Everyone

What's new in v1.0.42

Minor bug fixes and stability improvements.

Permissions (25)

This version requests 25 permissions, 10 of them sensitive.

Security & authenticity

Security rating: Trusted

Signing certificate

  • Signature matches the Google Play version Checked by the source store on Aug 29, 2025.
  • Certificate issued to “Maxim Barsuk” This is the certificate of the Google Play version.
  • Same certificate as the 4 other versions checked

Store checks

  • Developer signature verified Aug 29, 2025
  • Validated against Google Play Aug 29, 2025
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (4 other versions compared). AAPKs doesn't scan files itself.

How to install Construction Change Order on Android 8.1+

You'll need about 378.6 MB of free space.

  1. Download the APK — tap Download APK above (189.3 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
  2. Open the file — tap the download notification, or open Files › Downloads and tap com-snappii-corp-construction-change-order-1000042-71545205-2105dd995ca8deb57b19cdee8a63633e.apk.
  3. Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
  4. Check the file (optional) — the MD5 of the downloaded file should be 2105dd995ca8deb57b19cdee8a63633e. If it differs, the file is damaged or was changed: delete it and download again.
  5. Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
  6. Open Construction Change Order — tap Open on the install screen, or find it in your app drawer.
Common install problems
  • “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
  • “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 8.1+). Download it again, or pick an older version.
  • “App not compatible with your device” — this build contains native code for x86 32-bit, x86 64-bit, ARM (legacy), ARM 32-bit, ARM 64-bit, MIPS only. Devices with other processors can't install it.
  • Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.

Other versions (5)

Back to all versions