All versions of Construction Change Order
com.snappii_corp.construction_change_order · 5 versions
Construction Change Order has 5 versions listed, going back to v1.0.37. Since v1.0.37 the APK grew from 14.1 MB to 15.6 MB.
Minimum Android version over time
- From v1.0.42: requires Android 8.1+
- From v1.0.39: requires Android 7.1+
Older versions are the way to go if your device runs an earlier Android release.
All 5 versions checked are signed with the same certificate (B4:67:DF:8B…, issued to “Maxim Barsuk”), so they can update one another.
Versions, newest first
v1.0.44 (1000044) LATEST
MD5 aa15dac6670dcf1e5533292edf02862c
What's new (as uploaded)
Minor bug fixes and stability improvements.
v1.0.43 (1000043)
MD5 e01c2a019e96e3f20b056ffb32841e32
Same release notes as v1.0.44.
v1.0.42 (1000042)
MD5 2105dd995ca8deb57b19cdee8a63633e
Same release notes as v1.0.44.
v1.0.39 (1000039)
MD5 87b9dc9f3c709409df1e789a67d5e2f1
Same release notes as v1.0.44.
v1.0.37 (1000037)
MD5 c256eb12ec5d171b2500cc1c55bddd18
Same release notes as v1.0.44.