Construction Change Order v1.0.37

APK · 14.1 MB · version code 1000037 · Android 6.0+ · uploaded Jun 9, 2023

MD5 c256eb12ec5d171b2500cc1c55bddd18 TRUSTED

  • Same certificate as v1.0.44, which matches Google Play Details

Quick check before downloading

Answer this to unlock the download. It keeps automated downloaders away.

Compared with the latest version

The latest version is v1.0.44, uploaded May 29, 2026 — about 2 years after this one.

  • Size: this file is 14.1 MB; the latest is 15.6 MB (1.5 MB larger).
  • Android: this version needs Android 6.0+; the latest needs Android 8.1+. Use this one if your device runs an older Android release.
  • The latest version asks for 4 more permissions: Show notifications, Read media audio, Schedule exact alarms, Advertising ID.

File information

Version
v1.0.37 (1000037)
Uploaded
Jun 9, 2023
Size
14.1 MB
Requires
Android 6.0+ (API 23)
CPU support
Any (no native code)
Graphics
OpenGL ES 2.0+
Screen
Small screens and larger
MD5
c256eb12ec5d171b2500cc1c55bddd18
Signing certificate (SHA-1)
B4:67:DF:8B:22:64:A6:C0:0C:75:8E:BE:7D:A2:36:BA:0B:26:17:35
Signed by
CN=Maxim Barsuk
File name
com-snappii-corp-construction-change-order-1000037-65193607-c256eb12ec5d171b2500cc1c55bddd18.apk
Package
com.snappii_corp.construction_change_order
Downloads (all versions)
1K+
Age rating
PEGI 3 · Everyone

What's new in v1.0.37

Minor bug fixes and stability improvements.

Permissions (19)

This version requests 19 permissions, 7 of them sensitive.

Security & authenticity

Security rating: Trusted

Signing certificate

  • Certificate issued to “Maxim Barsuk” This is the certificate of the Google Play version.
  • Same certificate as v1.0.44, which matches Google Play v1.0.44 · v1.0.43 · v1.0.42

Store checks

  • Developer signature verified Jun 9, 2023
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (4 other versions compared). AAPKs doesn't scan files itself.

How to install Construction Change Order on Android 6.0+

You'll need about 28.2 MB of free space.

  1. Download the APK — tap Download APK above (14.1 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
  2. Open the file — tap the download notification, or open Files › Downloads and tap com-snappii-corp-construction-change-order-1000037-65193607-c256eb12ec5d171b2500cc1c55bddd18.apk.
  3. Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
  4. Check the file (optional) — the MD5 of the downloaded file should be c256eb12ec5d171b2500cc1c55bddd18. If it differs, the file is damaged or was changed: delete it and download again.
  5. Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
  6. Open Construction Change Order — tap Open on the install screen, or find it in your app drawer.
Common install problems
  • “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
  • “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 6.0+). Download it again, or pick an older version.
  • Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.

Other versions (5)

Back to all versions