Construction Change Order icon

Construction Change Order

v1.0.44 · 15.6 MB · code 1000044

1a8b82e2b112f8cd58e8d9667a5d1f41 TRUSTED

Verify you're human

Solve this to start the download.

File information

UpdatedFeb 2, 2026
PublishedJun 9, 2023
Packagecom.snappii_corp.construction_change_order
Versionv1.0.44 (1000044)
Size15.6 MB
MD51a8b82e2b112f8cd58e8d9667a5d1f41
Min SDK27
Malware scanTRUSTED
Signature SHA1B4:67:DF:8B:22:64:A6:C0:0C:75:8E:BE:7D:A2:36:BA:0B:26:17:35
SignerCN=Maxim Barsuk
Total downloads1,000
This version1,000
DeveloperSnappii
Age ratingEveryone

What's new in v1.0.44

Minor bug fixes and stability improvements.

Security scan

TRUSTED
  • Developer signature verified 2026-02-02
  • Signature SHA1 B4:67:DF:8B:22:64:A6:C0:0C:75:8E:BE:7D:A2:36:BA:0B:26:17:35
  • File MD5 1a8b82e2b112f8cd58e8d9667a5d1f41

How to install Construction Change Order v1.0.44 on Android API 27+

Takes about 2 minutes. You'll need roughly 15.6 MB of free storage.

  1. Grab com.snappii_corp.construction_change_order_1000044.apk — hit the Download button above (15.6 MB). If your browser warns about APK files, choose Keep or Download anyway — that warning fires on every APK, not just this one.
  2. Trust your browser to install — on Android 8+ go to Settings → Apps → Special access → Install unknown apps, pick the app you downloaded with (Chrome, Firefox, Files, etc.), and flip Allow from this source. On older Android, toggle Unknown sources under Security.
  3. (Optional) Verify the file — compute the MD5 of the downloaded APK and make sure it matches 1a8b82e2b112f8cd…. Any difference means the file is corrupted or tampered — delete and re-download.
  4. Open the APK — tap the download notification, or find com.snappii_corp.construction_change_order_1000044.apk in your Files app under Downloads, then tap it. Android's package installer will appear.
  5. Check the signer — the install screen will name the publisher. For this build it should read CN=Maxim Barsuk. If it doesn't match, cancel — you have the wrong file.
  6. Review permissions & tap Install — scroll the permission list, then confirm. If Play Protect flags it, tap Install anyway (this APK was scanned as TRUSTED).
  7. Done — open Construction Change Order — tap Open on the install screen, or find the Construction Change Order icon in your app drawer.
Common install errors for Construction Change Order
  • "App not installed" — usually means an older or differently-signed version is already on your device. Uninstall it first, then retry. Your data may be lost unless you back it up.
  • "Parse error" — the APK is for a newer Android than yours. This version needs Android API 27 or later. Pick an older build from the versions list below.
  • "There was a problem parsing the package" — the download was interrupted. Delete the file and re-download over Wi-Fi.

All versions (5)

All versions page