Oracle Primavera Unifier icon

Oracle Primavera Unifier

v26.4.1 · 55.6 MB · code 176

f84eb2ba8ee7a794726056955609bf1c TRUSTED

Verify you're human

Solve this to start the download.

File information

UpdatedApr 16, 2026
PublishedMar 22, 2021
Packagecom.oracle.cegbu.unifier
Versionv26.4.1 (176)
Size55.6 MB
MD5f84eb2ba8ee7a794726056955609bf1c
Min SDK21
ABIsarmeabi-v7a, arm64-v8a
Malware scanTRUSTED
Signature SHA10C:03:0F:DD:F5:24:27:BB:84:86:90:9F:F0:B7:01:55:DA:6D:49:7D
SignerCN=CodeSigning for Oracle America Inc., OU=Android Code Signing, OU=Software Engineering, O=Oracle America Inc., L=Redwood Shores, ST=California, C=US
Total downloads10,000
This version10,000
DeveloperOracle America, Inc.
Age ratingEveryone

What's new in v26.4.1

•Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips

•Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience

•Technical improvements and bug fixes

Security scan

TRUSTED
  • Developer signature verified 2026-04-16
  • Signature SHA1 0C:03:0F:DD:F5:24:27:BB:84:86:90:9F:F0:B7:01:55:DA:6D:49:7D
  • File MD5 f84eb2ba8ee7a794726056955609bf1c

How to install Oracle Primavera Unifier v26.4.1 on Android 5.0 Lollipop+

Takes about 2 minutes. You'll need roughly 55.6 MB of free storage.

  1. Grab com.oracle.cegbu.unifier_176.apk — hit the Download button above (55.6 MB). If your browser warns about APK files, choose Keep or Download anyway — that warning fires on every APK, not just this one.
  2. Trust your browser to install — on Android 8+ go to Settings → Apps → Special access → Install unknown apps, pick the app you downloaded with (Chrome, Firefox, Files, etc.), and flip Allow from this source. On older Android, toggle Unknown sources under Security.
  3. (Optional) Verify the file — compute the MD5 of the downloaded APK and make sure it matches f84eb2ba8ee7a794…. Any difference means the file is corrupted or tampered — delete and re-download.
  4. Open the APK — tap the download notification, or find com.oracle.cegbu.unifier_176.apk in your Files app under Downloads, then tap it. Android's package installer will appear.
  5. Check the signer — the install screen will name the publisher. For this build it should read CN=CodeSigning for Oracle America Inc., OU=Android Code Signing, OU=Software Engineering, O=Oracle America Inc., L=Redwood Shores, ST=California, C=US. If it doesn't match, cancel — you have the wrong file.
  6. Review permissions & tap Install — scroll the permission list, then confirm. If Play Protect flags it, tap Install anyway (this APK was scanned as TRUSTED).
  7. Done — open Oracle Primavera Unifier — tap Open on the install screen, or find the Oracle Primavera Unifier icon in your app drawer (this build targets armeabi-v7a/arm64-v8a devices).
Common install errors for Oracle Primavera Unifier
  • "App not installed" — usually means an older or differently-signed version is already on your device. Uninstall it first, then retry. Your data may be lost unless you back it up.
  • "Parse error" — the APK is for a newer Android than yours. This version needs Android 5.0 Lollipop or later. Pick an older build from the versions list below.
  • "There was a problem parsing the package" — the download was interrupted. Delete the file and re-download over Wi-Fi.
  • Works on one phone but not another — this build ships armeabi-v7a/arm64-v8a native code. Devices with a different CPU will reject it.

All versions (5)

All versions page