Oracle Primavera Unifier
v25.12 · 55.5 MB · code 172
Verify you're human
Solve this to start the download.
File information
UpdatedDec 10, 2025
PublishedMar 22, 2021
Packagecom.oracle.cegbu.unifier
Versionv25.12 (172)
Size55.5 MB
MD5683c27965e33555e4ab63b7470cc18d3
Min SDK21
ABIsarmeabi-v7a, arm64-v8a
Malware scanTRUSTED
Signature SHA10C:03:0F:DD:F5:24:27:BB:84:86:90:9F:F0:B7:01:55:DA:6D:49:7D
SignerCN=CodeSigning for Oracle America Inc., OU=Android Code Signing, OU=Software Engineering, O=Oracle America Inc., L=Redwood Shores, ST=California, C=US
Total downloads10,000
This version10,000
DeveloperOracle America, Inc.
Age ratingEveryone
What's new in v25.12
•Technical improvements and bug fixes.
Security scan
TRUSTED
- Developer signature verified 2025-12-10
- Signature SHA1 0C:03:0F:DD:F5:24:27:BB:84:86:90:9F:F0:B7:01:55:DA:6D:49:7D
- File MD5 683c27965e33555e4ab63b7470cc18d3
How to install Oracle Primavera Unifier v25.12 on Android 5.0 Lollipop+
Takes about 2 minutes. You'll need roughly 55.5 MB of free storage.
- Grab com.oracle.cegbu.unifier_172.apk — hit the Download button above (55.5 MB). If your browser warns about APK files, choose Keep or Download anyway — that warning fires on every APK, not just this one.
- Trust your browser to install — on Android 8+ go to Settings → Apps → Special access → Install unknown apps, pick the app you downloaded with (Chrome, Firefox, Files, etc.), and flip Allow from this source. On older Android, toggle Unknown sources under Security.
- (Optional) Verify the file — compute the MD5 of the downloaded APK and make sure it matches 683c27965e33555e…. Any difference means the file is corrupted or tampered — delete and re-download.
- Open the APK — tap the download notification, or find com.oracle.cegbu.unifier_172.apk in your Files app under Downloads, then tap it. Android's package installer will appear.
- Check the signer — the install screen will name the publisher. For this build it should read CN=CodeSigning for Oracle America Inc., OU=Android Code Signing, OU=Software Engineering, O=Oracle America Inc., L=Redwood Shores, ST=California, C=US. If it doesn't match, cancel — you have the wrong file.
- Review permissions & tap Install — scroll the permission list, then confirm. If Play Protect flags it, tap Install anyway (this APK was scanned as TRUSTED).
- Done — open Oracle Primavera Unifier — tap Open on the install screen, or find the Oracle Primavera Unifier icon in your app drawer (this build targets armeabi-v7a/arm64-v8a devices).
Common install errors for Oracle Primavera Unifier
- "App not installed" — usually means an older or differently-signed version is already on your device. Uninstall it first, then retry. Your data may be lost unless you back it up.
- "Parse error" — the APK is for a newer Android than yours. This version needs Android 5.0 Lollipop or later. Pick an older build from the versions list below.
- "There was a problem parsing the package" — the download was interrupted. Delete the file and re-download over Wi-Fi.
- Works on one phone but not another — this build ships armeabi-v7a/arm64-v8a native code. Devices with a different CPU will reject it.