
Oracle Primavera Unifier
Unifier
Oracle America, Inc. · com.oracle.cegbu.unifier
- Signature matches the Google Play version Details
At a glance
- Latest version
- v26.10 (184)
- Updated
- Oct 6, 2026 (2 days ago)
- APK size
- 67 MB
- Requires
- Android 5.0+ (API 21)
- CPU support
- ARM 32-bit, ARM 64-bit
- Graphics
- OpenGL ES 2.0+
- Category
- Business (app)
- Listed since
- Mar 22, 2021 (at least)
- Permissions
- 17 (6 sensitive)
- Website
- oracle.com
- Developer contact
- [email protected]
- Privacy
- Developer's privacy policy
About this APK
Oracle Primavera Unifier is an app by Oracle America, Inc. in the Business category, listed since at least March 2021. It includes native code for ARM 32-bit and ARM 64-bit, so it runs on practically every phone.
Since version 26.1, the APK grew from 55.5 MB to 67 MB. It asks for 17 permissions, 6 of them sensitive, including precise location, camera and record audio. It asks for the same permissions as version 26.7.1. The app can read the advertising ID that ad and analytics services use.
What's new in v26.10
Description
From the listing uploaded by “appupdater”.
Version history
5 versions are listed, going back to v26.1. New versions arrive here every few months.
Security & authenticity
Signing certificate
- Signature matches the Google Play version Checked by the source store on Oct 6, 2026.
- Certificate issued to “Oracle America Inc.” This is the certificate of the Google Play version.
- Same certificate as the 2 other versions checked
Store checks and file details
- Developer signature verified Oct 6, 2026
- Validated against Google Play Oct 6, 2026
- Signed byCN=CodeSigning for Oracle America Inc., OU=Android Code Signing, OU=Software Engineering, O=Oracle America Inc., L=Redwood Shores, ST=California, C=US
- Signing certificate (SHA-1)0C:03:0F:DD:F5:24:27:BB:84:86:90:9F:F0:B7:01:55:DA:6D:49:7D
- File MD522a8819da32909548c39620ca6deeac1
- Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020
Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (2 other versions compared). AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.
Permissions (17)
Oracle Primavera Unifier requests 17 permissions, 6 of them sensitive.
- Approximate location Sensitive android.permission.ACCESS_COARSE_LOCATION
- Call phone Sensitive android.permission.CALL_PHONE
- Camera Sensitive android.permission.CAMERA
- Modify shared storage Sensitive android.permission.WRITE_EXTERNAL_STORAGE
- Precise location Sensitive android.permission.ACCESS_FINE_LOCATION
- Record audio (microphone) Sensitive android.permission.RECORD_AUDIO
- Access adservices ad id android.permission.ACCESS_ADSERVICES_AD_ID
- Access adservices attribution android.permission.ACCESS_ADSERVICES_ATTRIBUTION
- Advertising ID com.google.android.gms.permission.AD_ID
- Full network access android.permission.INTERNET
- Google Play install referrer com.google.android.finsky.permission.BIND_GET_INSTALL_REFERRER_SERVICE
- Internal broadcast protection (app-defined) com.oracle.cegbu.unifier.DYNAMIC_RECEIVER_NOT_EXPORTED_PERMISSION
- Modify audio settings android.permission.MODIFY_AUDIO_SETTINGS
- Prevent the device from sleeping android.permission.WAKE_LOCK
- Receive push notifications com.google.android.c2dm.permission.RECEIVE
- Show notifications android.permission.POST_NOTIFICATIONS
- View network connections android.permission.ACCESS_NETWORK_STATE
Required hardware & features
- Basic touch input android.hardware.faketouch
- Location android.hardware.location
- Microphone android.hardware.microphone
- Portrait screen android.hardware.screen.portrait
Oracle Primavera Unifier APK: questions and answers
Can I install this APK over the version I already have?
Yes, if your installed copy is older. It is signed like the Google Play version, so Android installs it as an update and keeps your data.
Is the Oracle Primavera Unifier APK safe?
No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. Its signature matches the Google Play version. It is signed with the same certificate as the 2 other versions checked. After downloading, check that the file's MD5 is 22a8819da32909548c39620ca6deeac1.