Oracle Primavera Unifier v26.7
APK · 55.7 MB · version code 180 · Android 5.0+ · uploaded Jul 6, 2026
- Signature matches the Google Play version Details
Quick check before downloading
Answer this to unlock the download. It keeps automated downloaders away.
Compared with the latest version
The latest version is v26.10, uploaded Oct 6, 2026 — about 3 months after this one.
- Size: this file is 55.7 MB; the latest is 67 MB (11.3 MB larger).
- Both versions request the same permissions.
File information
- Version
- v26.7 (180)
- Uploaded
- Jul 6, 2026
- Size
- 55.7 MB
- Requires
- Android 5.0+ (API 21)
- CPU support
- ARM 32-bit, ARM 64-bit
- Graphics
- OpenGL ES 2.0+
- Screen
- Small screens and larger
- MD5
- 88c8f05e24b67868693244858de63516
- Signing certificate (SHA-1)
- 0C:03:0F:DD:F5:24:27:BB:84:86:90:9F:F0:B7:01:55:DA:6D:49:7D
- Signed by
- CN=CodeSigning for Oracle America Inc., OU=Android Code Signing, OU=Software Engineering, O=Oracle America Inc., L=Redwood Shores, ST=California, C=US
- File name
- com-oracle-cegbu-unifier-180-75549854-88c8f05e24b67868693244858de63516.apk
- Package
- com.oracle.cegbu.unifier
- Downloads (all versions)
- 10K+
- Age rating
- PEGI 3 · Everyone
What's new in v26.7
Technical improvements and bug fixes.
Permissions (17)
This version requests 17 permissions, 6 of them sensitive.
- Approximate location Sensitive android.permission.ACCESS_COARSE_LOCATION
- Call phone Sensitive android.permission.CALL_PHONE
- Camera Sensitive android.permission.CAMERA
- Modify shared storage Sensitive android.permission.WRITE_EXTERNAL_STORAGE
- Precise location Sensitive android.permission.ACCESS_FINE_LOCATION
- Record audio (microphone) Sensitive android.permission.RECORD_AUDIO
- Access adservices ad id android.permission.ACCESS_ADSERVICES_AD_ID
- Access adservices attribution android.permission.ACCESS_ADSERVICES_ATTRIBUTION
- Advertising ID com.google.android.gms.permission.AD_ID
- Full network access android.permission.INTERNET
- Google Play install referrer com.google.android.finsky.permission.BIND_GET_INSTALL_REFERRER_SERVICE
- Internal broadcast protection (app-defined) com.oracle.cegbu.unifier.DYNAMIC_RECEIVER_NOT_EXPORTED_PERMISSION
- Modify audio settings android.permission.MODIFY_AUDIO_SETTINGS
- Prevent the device from sleeping android.permission.WAKE_LOCK
- Receive push notifications com.google.android.c2dm.permission.RECEIVE
- Show notifications android.permission.POST_NOTIFICATIONS
- View network connections android.permission.ACCESS_NETWORK_STATE
Security & authenticity
Security rating: Trusted
Signing certificate
- Signature matches the Google Play version Checked by the source store on Jul 6, 2026.
- Certificate issued to “Oracle America Inc.” This is the certificate of the Google Play version.
- Same certificate as the 4 other versions checked
Store checks
- Developer signature verified Jul 6, 2026
- Validated against Google Play Jul 6, 2026
- Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020
Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (4 other versions compared). AAPKs doesn't scan files itself.
How to install Oracle Primavera Unifier on Android 5.0+
You'll need about 111.3 MB of free space.
- Download the APK — tap Download APK above (55.7 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
- Open the file — tap the download notification, or open Files › Downloads and tap com-oracle-cegbu-unifier-180-75549854-88c8f05e24b67868693244858de63516.apk.
- Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
- Check the file (optional) — the MD5 of the downloaded file should be 88c8f05e24b67868693244858de63516. If it differs, the file is damaged or was changed: delete it and download again.
- Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
- Open Oracle Primavera Unifier — tap Open on the install screen, or find it in your app drawer.
Common install problems
- “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
- “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 5.0+). Download it again, or pick an older version.
- “App not compatible with your device” — this build contains native code for ARM 32-bit, ARM 64-bit only. Devices with other processors can't install it.
- Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.