Earned Value Management v2.0

APK · 15.1 MB · version code 3 · Android 6.0+ · uploaded Sep 2, 2026

MD5 3e4451fa0846e257351c7ab0abe93242 TRUSTED

  • Signature matches the Google Play version Details

Quick check before downloading

Answer this to unlock the download. It keeps automated downloaders away.

File information

Version
v2.0 (3)
Uploaded
Sep 2, 2026
Size
15.1 MB
Requires
Android 6.0+ (API 23)
CPU support
x86 32-bit, x86 64-bit, ARM 32-bit, ARM 64-bit
Screen
Small screens and larger
MD5
3e4451fa0846e257351c7ab0abe93242
Signing certificate (SHA-1)
A9:B9:9D:F5:13:AA:85:D7:F9:72:0E:AD:6A:83:8D:51:85:E7:34:F4
Signed by
CN=Rajil Tl, OU=App development, O=Softecks, L=Mumbai, ST=Maharashtra, C=IN
File name
in-softecks-earnedvaluemanagement-3-76390371-3e4451fa0846e257351c7ab0abe93242.apk
Package
in.softecks.earnedvaluemanagement
Downloads (all versions)
500+
Age rating
PEGI 3 · Everyone

What's new in v2.0

✅ Improved layout and design ✅ Made subject categories offline compatible ✅ Added Light/Dark theme switch ✅ Enhanced offline support ✅ Improved search, bookmarks, performance and user experience

Permissions (12)

This version requests 12 permissions, none of them sensitive.

Security & authenticity

Security rating: Trusted

Signing certificate

  • Signature matches the Google Play version Checked by the source store on Sep 2, 2026.
  • Certificate issued to “Softecks” This is the certificate of the Google Play version.
  • Same certificate as the other version checked

Store checks

  • Developer signature verified Sep 2, 2026
  • Validated against Google Play Sep 2, 2026
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (1 other version compared). AAPKs doesn't scan files itself.

How to install Earned Value Management on Android 6.0+

You'll need about 30.3 MB of free space.

  1. Download the APK — tap Download APK above (15.1 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
  2. Open the file — tap the download notification, or open Files › Downloads and tap in-softecks-earnedvaluemanagement-3-76390371-3e4451fa0846e257351c7ab0abe93242.apk.
  3. Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
  4. Check the file (optional) — the MD5 of the downloaded file should be 3e4451fa0846e257351c7ab0abe93242. If it differs, the file is damaged or was changed: delete it and download again.
  5. Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
  6. Open Earned Value Management — tap Open on the install screen, or find it in your app drawer.
Common install problems
  • “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
  • “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 6.0+). Download it again, or pick an older version.
  • “App not compatible with your device” — this build contains native code for x86 32-bit, x86 64-bit, ARM 32-bit, ARM 64-bit only. Devices with other processors can't install it.
  • Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.

Other versions (2)

Back to all versions