Earned Value Management app icon

Earned Value Management

A reference app for those involved in DoD Earned Value Management processes

ThinChip Software · net.drruss.evm

Not rated yet 500+ downloads v1.5 2 MB Android 4.4+ PEGI 3 · Everyone

At a glance

Latest version
v1.5 (11)
Updated
Jan 6, 2025 (1 year ago)
APK size
2 MB
Requires
Android 4.4+ (API 19)
CPU support
Any (no native code)
Category
Productivity (app)
Listed since
Mar 15, 2021 (at least)
Permissions
2
Website
thinchip.com
Developer contact
[email protected]

About this APK

Earned Value Management is an app by ThinChip Software in the Productivity category, listed since at least March 2021. It has no native code, so it runs on any Android processor.

It asks for 2 permissions, none of them sensitive.

What's new in v1.5

Icon update and a lot of under-the-hood improvements. Updated links in Resources section, too!

Description

From the listing uploaded by “appupdater”.

This app provides a handy pocket reference for engineers, logisticians and program managers involved in the Department of Defense's Earned Value Management processes. Features include: *Easy-to-understand DoD EVM guidelines *EVM equations listed alphabetically, with all variables defined *EVM equation calculators. Let us do the math for you! *Links to connect you to the larger DoD EVM community All ThinChip Software apps are free to active duty military personnel. Contact us at [email protected] to find out more.

Security & authenticity

Security rating: Trusted

Signing certificate

  • Certificate issued to “Russell Shannon” Not the developer's name (“ThinChip Software”). Names in certificates can't be verified, so this alone proves nothing.

Store checks and file details

  • Developer signature verified Jan 6, 2025
  • Signed byCN=Russell Shannon, OU=Russell Shannon, O=Russell Shannon, L=Ocean Gate, ST=New Jersey, C=US
  • Signing certificate (SHA-1)87:B3:6A:82:95:E5:65:F1:B7:68:0A:0D:B5:7C:D7:E8:2D:1F:CC:83
  • File MD56deaae6f067c2e4d66bfaaf1c0dc37f0
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures. AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.

Permissions (2)

Earned Value Management requests 2 permissions, none of them sensitive.

Required hardware & features

Earned Value Management APK: questions and answers

Can I install this APK over the version I already have?

Only if it is signed with the same certificate as the copy on your phone and isn't an older version. If Android says “App not installed”, the certificates differ; uninstalling your copy first works but deletes its data unless it is backed up.

Is the Earned Value Management APK safe?

No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. After downloading, check that the file's MD5 is 6deaae6f067c2e4d66bfaaf1c0dc37f0.

Tags

More Productivity apps