Earned Value Management v1.5
APK · 2 MB · version code 11 · Android 4.4+ · uploaded Jan 6, 2025
Quick check before downloading
Answer this to unlock the download. It keeps automated downloaders away.
File information
- Version
- v1.5 (11)
- Uploaded
- Jan 6, 2025
- Size
- 2 MB
- Requires
- Android 4.4+ (API 19)
- CPU support
- Any (no native code)
- Screen
- Small screens and larger
- MD5
- 6deaae6f067c2e4d66bfaaf1c0dc37f0
- Signing certificate (SHA-1)
- 87:B3:6A:82:95:E5:65:F1:B7:68:0A:0D:B5:7C:D7:E8:2D:1F:CC:83
- Signed by
- CN=Russell Shannon, OU=Russell Shannon, O=Russell Shannon, L=Ocean Gate, ST=New Jersey, C=US
- File name
- net-drruss-evm-11-69620117-6deaae6f067c2e4d66bfaaf1c0dc37f0.apk
- Package
- net.drruss.evm
- Downloads (all versions)
- 500+
- Age rating
- PEGI 3 · Everyone
What's new in v1.5
Icon update and a lot of under-the-hood improvements. Updated links in Resources section, too!
Permissions (2)
This version requests 2 permissions, none of them sensitive.
- Full network access android.permission.INTERNET
- View network connections android.permission.ACCESS_NETWORK_STATE
Security & authenticity
Security rating: Trusted
Signing certificate
- Certificate issued to “Russell Shannon” Not the developer's name (“ThinChip Software”). Names in certificates can't be verified, so this alone proves nothing.
Store checks
- Developer signature verified Jan 6, 2025
- Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020
Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures. AAPKs doesn't scan files itself.
How to install Earned Value Management on Android 4.4+
You'll need about 4 MB of free space.
- Download the APK — tap Download APK above (2 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
- Open the file — tap the download notification, or open Files › Downloads and tap net-drruss-evm-11-69620117-6deaae6f067c2e4d66bfaaf1c0dc37f0.apk.
- Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
- Check the file (optional) — the MD5 of the downloaded file should be 6deaae6f067c2e4d66bfaaf1c0dc37f0. If it differs, the file is damaged or was changed: delete it and download again.
- Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
- Open Earned Value Management — tap Open on the install screen, or find it in your app drawer.
Common install problems
- “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
- “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 4.4+). Download it again, or pick an older version.
- Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.