Crunchtime Impact v2.10.0 (894)

APK · 39.7 MB · version code 210000894 · Android 8.0+ · uploaded Jul 3, 2024

MD5 a4cf10a432dcdee304b7af4483db0b3b TRUSTED

Quick check before downloading

Answer this to unlock the download. It keeps automated downloaders away.

File information

Version
v2.10.0 (894) (210000894)
Uploaded
Jul 3, 2024
Size
39.7 MB
Requires
Android 8.0+ (API 26)
CPU support
x86 32-bit, x86 64-bit, ARM 32-bit, ARM 64-bit
Screen
Small screens and larger
MD5
a4cf10a432dcdee304b7af4483db0b3b
Signing certificate (SHA-1)
B5:3A:8A:76:69:7C:7E:03:C4:36:0E:54:17:28:4C:E7:64:AD:B9:D3
Signed by
CN=Alexander Gertsyk, OU=home, O=home, L=Minsk, ST=Minsk, C=BE
File name
com-crunchtime-impact-android-210000894-68164232-a4cf10a432dcdee304b7af4483db0b3b.apk
Package
com.crunchtime.Impact.Android
Downloads (all versions)
10K+
Age rating
PEGI 3 · Everyone

What's new in v2.10.0 (894)

- Refreshed look, feel, & logos - Various bug fixes & performance improvements

Permissions (8)

This version requests 8 permissions, 1 of them sensitive.

Security & authenticity

Security rating: Trusted

Signing certificate

  • Certificate issued to “home” Not the developer's name (“CrunchTime! Information Systems, Inc.”). Names in certificates can't be verified, so this alone proves nothing.

Store checks

  • Developer signature verified Jul 3, 2024
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures. AAPKs doesn't scan files itself.

How to install Crunchtime Impact on Android 8.0+

You'll need about 79.5 MB of free space.

  1. Download the APK — tap Download APK above (39.7 MB). Chrome shows “File might be harmful” for every APK file; choose Download anyway only if you trust this file.
  2. Open the file — tap the download notification, or open Files › Downloads and tap com-crunchtime-impact-android-210000894-68164232-a4cf10a432dcdee304b7af4483db0b3b.apk.
  3. Allow the install (first time only) — Android 8 and later asks for permission the first time an app opens an APK: tap Settings in the prompt, turn on Allow from this source, then go back. Manual path: Settings › Apps › Special app access › Install unknown apps (on Samsung: Settings › Apps › ⋮ › Special access). On Android 7 and older: Settings › Security › Unknown sources.
  4. Check the file (optional) — the MD5 of the downloaded file should be a4cf10a432dcdee304b7af4483db0b3b. If it differs, the file is damaged or was changed: delete it and download again.
  5. Tap Install — Android asks “Do you want to install this app?”. If Google Play Protect shows a warning, read it before you continue: the source store rated this file Trusted, but only install apps from sources you trust. If an earlier version is installed, this one only installs as an update when it is signed with the same certificate (SHA-1 shown above).
  6. Open Crunchtime Impact — tap Open on the install screen, or find it in your app drawer.
Common install problems
  • “App not installed” — a version signed with a different certificate, or a newer version, is already installed (Android doesn't allow downgrades). Uninstall it first; back up your data, because uninstalling deletes it.
  • “There was a problem parsing the package” — the file is incomplete, or your Android is too old (this version needs Android 8.0+). Download it again, or pick an older version.
  • “App not compatible with your device” — this build contains native code for x86 32-bit, x86 64-bit, ARM 32-bit, ARM 64-bit only. Devices with other processors can't install it.
  • Blocked by Play Protect — Play Protect checks apps from outside the Play Store. Only continue if you trust the source.

Other versions (1)

Back to all versions