Crunchtime Impact app icon

Crunchtime Impact

Monitor sales. Track food and labor costs. See Guest and Check counts, and more!

CrunchTime! Information Systems, Inc. · com.crunchtime.Impact.Android

Not rated yet 10K+ downloads v2.10.0 (894) 39.7 MB Android 8.0+ PEGI 3 · Everyone

At a glance

Latest version
v2.10.0 (894) (210000894)
Updated
Jul 3, 2024 (2 years ago)
APK size
39.7 MB
Requires
Android 8.0+ (API 26)
CPU support
x86 32-bit, x86 64-bit, ARM 32-bit, ARM 64-bit
Category
Productivity (app)
Listed since
Aug 24, 2021 (at least)
Permissions
8 (1 sensitive)
Website
crunchtime.com
Developer contact
[email protected]
Privacy
Developer's privacy policy

About this APK

Crunchtime Impact is an app by CrunchTime! Information Systems, Inc. in the Productivity category, listed since at least August 2021. It includes native code for x86 32-bit, x86 64-bit, ARM 32-bit and ARM 64-bit, so it runs on practically every phone.

It asks for 8 permissions, 1 of them sensitive: record audio.

What's new in v2.10.0 (894)

- Refreshed look, feel, & logos - Various bug fixes & performance improvements

Description

From the listing uploaded by “appupdater”.

Monitor restaurant sales, food and labor costs, guest counts, labor costs, and so much more. Track real-time performance from the consolidated brand level down to each location. Quickly detect high-achievers and under-performers. Configure push notifications for upcoming or overdue restaurant tasks - and now you can navigate directly to Counter or Reconciler to complete them! Just enter your Crunchtime Net-Chef™ URL on the app’s configuration screen and get right to work using your existing Net-Chef credentials. NOTE: This app is intended for use with the Crunchtime core suite and requires additional licensing. Support is dependent on the use of the most recent mobile app version. Specific features and functions within the app may not be enabled at the administrator's discretion. Please contact your Crunchtime administrator with any questions.

Security & authenticity

Security rating: Trusted

Signing certificate

  • Certificate issued to “home” Not the developer's name (“CrunchTime! Information Systems, Inc.”). Names in certificates can't be verified, so this alone proves nothing.

Store checks and file details

  • Developer signature verified Jul 3, 2024
  • Signed byCN=Alexander Gertsyk, OU=home, O=home, L=Minsk, ST=Minsk, C=BE
  • Signing certificate (SHA-1)B5:3A:8A:76:69:7C:7E:03:C4:36:0E:54:17:28:4C:E7:64:AD:B9:D3
  • File MD5a4cf10a432dcdee304b7af4483db0b3b
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures. AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.

Permissions (8)

Crunchtime Impact requests 8 permissions, 1 of them sensitive.

Required hardware & features

Crunchtime Impact APK: questions and answers

Can I install this APK over the version I already have?

Only if it is signed with the same certificate as the copy on your phone and isn't an older version. If Android says “App not installed”, the certificates differ; uninstalling your copy first works but deletes its data unless it is backed up.

Is the Crunchtime Impact APK safe?

No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. After downloading, check that the file's MD5 is a4cf10a432dcdee304b7af4483db0b3b.

Tags

More Productivity apps