Site Logistics app icon

Site Logistics

App for people working in logistics at a company site.

Inform GmbH · com.inform.syncrosupplyOnsite

Not rated yet 5K+ downloads v3.54.0 55.2 MB Android 8.0+ PEGI 3 · Everyone

  • Signature matches the Google Play version Details

At a glance

Latest version
v3.54.0 (305400)
Updated
Oct 3, 2026 (6 days ago)
APK size
55.2 MB
Requires
Android 8.0+ (API 26)
CPU support
x86 32-bit, x86 64-bit, ARM 32-bit, ARM 64-bit
Category
Tools (app)
Listed since
Mar 27, 2021 (at least)
Permissions
26 (8 sensitive)
Website
inform-software.com
Developer contact
[email protected]
Privacy
Developer's privacy policy

About this APK

Site Logistics is an app by Inform GmbH in the Tools category, listed since at least March 2021. It includes native code for x86 32-bit, x86 64-bit, ARM 32-bit and ARM 64-bit, so it runs on practically every phone.

Since version 2.84.0, the APK grew from 17.8 MB to 55.2 MB and the minimum Android version rose from 5.1 to 8.0. It asks for 26 permissions, 8 of them sensitive, including precise location, location in the background and camera. It asks for the same permissions as version 3.50.1.

What's new in v3.54.0

Bugfixes & Improvements

Description

From the listing uploaded by “appupdater”.

Site Logistics supports people working at a company site in the completion of their operational tasks in the area of logistics. For example, this can include • Completing jobs or tasks of all kinds, including completion documentation like signatures or photos • Documentation of internal transports or material movements • GPS-supported display of vehicles or material on a map • Sending or receiving messages e.g. from dispatchers • Loading / Unloading of trucks, trains oder vessels • Creating new orders • Damage registration for cars Site Logistics is not limited to a particular line of business- it is used in various applications for example in industrial sites, hospitals or logistic centers and plants for finished vehicles. Site Logistics can work with various matching logistics systems of INFORM, but alternatively it can also be connected to other IT systems via a standard interface. In conjunction with the INFORM products SyncroTESS or SyncroSupply, Site Logistics workflows can make use of the powerful optimization routines of these products, thus enabling e.g. optimized order assignments or call-offs for trucks. In order to use Site Logistics, you need an account with appropriate rights in the system this app is connected to, e.g. • SyncroTESS Manufacturing logistics • SyncroTESS Healthcare • SyncroTESS Vehicle Distribution System • SyncroSupply

Version history

7 versions are listed, going back to v2.84.0. New versions arrive here every few months. Since v3.41.0 it requires Android 8.0+.

All 7 versions

Security & authenticity

Security rating: Trusted

Signing certificate

  • Signature matches the Google Play version Checked by the source store on Oct 3, 2026.
  • Certificate from Google Play App Signing Google keeps the signing key for the developer, so the certificate carries Google's name.
  • Same certificate as the 3 other versions checked

Store checks and file details

  • Developer signature verified Oct 3, 2026
  • Validated against Google Play Oct 3, 2026
  • Signed byCN=Android, OU=Android, O=Google Inc., L=Mountain View, ST=California, C=US
  • Signing certificate (SHA-1)91:12:6D:61:01:4E:0B:C3:A5:92:97:AC:EF:A5:AB:6C:6D:69:9C:E4
  • File MD581bb466d4e5cf4bf722c01bd584bf73c
  • Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020

Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures (3 other versions compared). AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.

Permissions (26)

Site Logistics requests 26 permissions, 8 of them sensitive.

Required hardware & features

Site Logistics APK: questions and answers

Is there a version of Site Logistics for older Android phones?

The current version needs Android 8.0 or later. Version 3.32.0 is the newest listed build that installs on Android 7.0 and later. Get version 3.32.0 · All versions

Can I install this APK over the version I already have?

Yes, if your installed copy is older. It is signed like the Google Play version, so Android installs it as an update and keeps your data.

Is the Site Logistics APK safe?

No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. Its signature matches the Google Play version. It is signed with the same certificate as the 3 other versions checked. After downloading, check that the file's MD5 is 81bb466d4e5cf4bf722c01bd584bf73c.

Tags

More Tools apps