
Risk Matrix Tool
Easily calculate hazard ratings for your JSAs, JHAs and SWMS.
Job Safety OnTheGo Pty. Ltd · com.jsotg.riskmatrixtool
At a glance
- Latest version
- v1.0.4 (6)
- Updated
- Jul 16, 2024 (2 years ago)
- APK size
- 1.2 MB
- Requires
- Android 2.1+ (API 7)
- CPU support
- Any (no native code)
- Category
- Productivity (app)
- Listed since
- Nov 3, 2020 (at least)
- Permissions
- 2
- Website
- jsaonthego.com
- Developer contact
- [email protected]
- Privacy
- Developer's privacy policy
About this APK
Risk Matrix Tool is an app by Job Safety OnTheGo Pty. Ltd in the Productivity category, listed since at least November 2020. It has no native code, so it runs on any Android processor.
It asks for 2 permissions, none of them sensitive.
What's new in v1.0.4
Description
From the listing uploaded by “appupdater”.
Security & authenticity
Signing certificate
- Certificate issued to “Job Safety OnTheGo” The developer's name — though anyone can put any name in a certificate.
Store checks and file details
- Developer signature verified Jul 16, 2024
- Antivirus scan result not available
- Signed byCN=Nathan Segaloff, O=Job Safety OnTheGo, C=AU
- Signing certificate (SHA-1)B2:D5:B7:04:C5:92:79:26:E1:6E:77:FC:47:CB:0B:BE:F8:DB:AB:91
- File MD53d770be181871bdb380bb16ae31712ae
- Uploaded by “appupdater” Gold tier · 117,810 followers · uploading since 2020
Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures. AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.
Permissions (2)
Risk Matrix Tool requests 2 permissions, none of them sensitive.
- Full network access android.permission.INTERNET
- Run foreground services android.permission.FOREGROUND_SERVICE
Required hardware & features
- Basic touch input android.hardware.faketouch
- Portrait screen android.hardware.screen.portrait
Risk Matrix Tool APK: questions and answers
Can I install this APK over the version I already have?
Only if it is signed with the same certificate as the copy on your phone and isn't an older version. If Android says “App not installed”, the certificates differ; uninstalling your copy first works but deletes its data unless it is backed up.
Is the Risk Matrix Tool APK safe?
No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. After downloading, check that the file's MD5 is 3d770be181871bdb380bb16ae31712ae.