Daily Progress Report Log app icon

Daily Progress Report Log

Complete your daily site reports in minutes using the Daily Progress report app.

Online Templatestore · com.ex.reportingapp

Not rated yet 10K+ downloads v1.1 7.3 MB Android 2.3+ PEGI 3 · Everyone

At a glance

Latest version
v1.1 (2)
Updated
Apr 17, 2020 (6 years ago)
APK size
7.3 MB
Requires
Android 2.3+ (API 9)
CPU support
Any (no native code)
Category
Tools (app)
Listed since
Jun 28, 2018 (at least)
Permissions
3 (1 sensitive)
Website
online-templatestore.com
Developer contact
[email protected]

About this APK

Daily Progress Report Log is an app by Online Templatestore in the Tools category, listed since at least June 2018. It has no native code, so it runs on any Android processor.

It asks for 3 permissions, 1 of them sensitive: modify shared storage.

What's new in v1.1

Functionality added: * Ability to Edit Saved reports * Identify saved reports from emailed reports Improvements made * Improved CSV excel summary report * Increased photo quality * Increased photo description field * Date format corrected * Celsius / Fahrenheit corrected on reports * Minor bug fixes corrected * Report numbering corrected

Description

From the listing uploaded by “apps”.

Tired of doing daily progress reports on paper? You can now create daily site reports in minutes from the convenience of your Smart Phone. This powerful project management app will not only allow you to record all important project detail, but also capture progress photos, deliveries, visitors, delays and so much more. All reports are stored on the phone’s database allowing the user easy access, viewing and storage in one single source. Easy to complete you will be able to send professional PDF reports in minutes. Features: * Customizable to include Company Information * Add Company Logo * Add and track Resource Categories * Automatically numbers reports * Add weather and site conditions * Add as many subcontractors / teams * Track Multiple projects and progress * Track Material deliveries, visitors and delays * Add unlimited progress photos * Database stores all saved reports * Email professional PDF reports directly to your Manager / Engineer / Client Get this powerful FREE app (limited time) now and say goodbye to doing daily reports on paper!! Examples of trades that can use this app are: General Contractors, Subcontractors, Project Managers, Construction Managers, Supervisors, Foreman, Mechanical Contractors, Electricians, Framers, Carpenters, HVAC, MEP, Flooring, Steel fixers, Concreters, Landscapers, Technicians, Builders, etc. Visit our website for more Construction related templates!

Security & authenticity

Security rating: Trusted

Signing certificate

  • Certificate issued to “Mouton” The developer's name — though anyone can put any name in a certificate.

Store checks and file details

  • Developer signature verified Apr 17, 2020
  • Antivirus scan passed Nov 15, 2020
  • Signed byCN=Mouton, OU=Online Tempatestore
  • Signing certificate (SHA-1)53:96:86:D7:C2:59:5F:F6:3C:67:DD:57:9E:6E:B2:06:E4:18:E2:77
  • File MD5f2d5fc1d227d562e7befc267e7834834
  • Uploaded by “apps” Platinum tier · 3,423,810 followers · uploading since 2010

Scans and ratings come from the source store; the certificate comparisons are AAPKs's own, made from the files' published signatures. AAPKs doesn't scan files itself — compare the MD5 and signer after downloading.

Permissions (3)

Daily Progress Report Log requests 3 permissions, 1 of them sensitive.

Required hardware & features

Daily Progress Report Log APK: questions and answers

Can I install this APK over the version I already have?

Only if it is signed with the same certificate as the copy on your phone and isn't an older version. If Android says “App not installed”, the certificates differ; uninstalling your copy first works but deletes its data unless it is backed up.

Is the Daily Progress Report Log APK safe?

No one can promise that a file is safe, but some things can be checked. The source store rates this file Trusted. After downloading, check that the file's MD5 is f2d5fc1d227d562e7befc267e7834834.

Tags

More Tools apps